• Skyrmir@lemmy.world
    link
    fedilink
    English
    arrow-up
    0
    ·
    1 month ago

    There are no electrical connections to the grid without a shut off. Every wire is required to have a rated shut off at the most basic level.

    • cynar@lemmy.world
      link
      fedilink
      English
      arrow-up
      0
      ·
      1 month ago

      Ok, so how do the grid controllers access that? How do you decide fairly which sites to turn off?

      • Skyrmir@lemmy.world
        link
        fedilink
        English
        arrow-up
        0
        ·
        1 month ago

        It depends on the supplier contract that has to be filed with RTE before you’re allowed to connect and transmit power.